Projects > Oil and Gas

Pneumatic to Distributed Control System Upgrade

To help our client meet product specification and station uptime requirements at a 50 year old 60MMSCFD gas fractionation plant, ZAP engineered a solution to replace the controls system while drastically minimizing production outages during the upgrade.