Projects > Greenfield Refrigeration Gas Plant

ZAP provided engineering, design, and procurement management for a 50 MMSCFD greenfield gas processing facility including:

  • Inlet liquids handling including 2,000 barrel fingers liquid storage
  • Inlet Liquids Stabilizer system
  • Enerflex supplied 50 MMSCFD Refrigeration Plant
  • EG injection and regeneration system
  • 2-2,000 HP Propane Compressors
  • NGL Storage/Loadout/Pipeline Pumps
  • Electric Power Generation (4 Caterpillar 3516 Gensets)
  • Two hot oil heater units
  • Flare and other utility systems to support the plant.

The project was completed on a tight timeline with close coordination between construction and engineering to deliver the project in less than 12 months from engineering kickoff to startup.