Projects > Walker Hollow Compressor Station

ZAP provided turnkey engineering and procurement services for the engineering phase of this project and subsequently served as the general contractor for the construction phase.  ZAP served in a unique EPC model where the equipment and critical materials were purchased through the Owner (maintaining the negotiated OEM discounts) with the construction materials and consumables purchased through ZAP.  The project was completed on an expedited timeline from engineering kickoff to startup with the project engineered, installed, and commissioned in 12 months.

  • Facility Description
    • 55mmscfd throughput (with additional 95mmscfd future capacity)
    • TEG dehydration
    • Inlet slug handing
    • Condensate storage and pump around
    • Flash Gas Compression and BTEX compliance