Engineering &
Construction Services, Inc.

Cement and Slag Import Terminal

Cement and Slag Import Terminal

ZAP provided preliminary engineering and design for a cement and granulated blast furnace slag import and distribution terminal. The project included three 20,000 ton import silos and two 5,000 ton silos for barge loading distribution operations. Preliminary design included interface with existing terminal equipment and structures, layout of storage and conveying equipment, maintenance access planning, and structural design. Project deliverables included a total installed cost estimate, preliminary layout, and structural drawings.

Meet the Team. (877) 827-0814

Call or send us your scope and we’ll assemble the team of experts who will help you successfully execute your project.

Schedule a meeting

ZAP ECS Logo

Excellence in Execution

Latest news and updates from around the company.

See All News

Steve Tzap Awarded the GPA Midstream Recognition Award

The GPA Midstream has awarded Steve Tzap The Recognition Award for his service to the Gas Processors Association over the years. The Recognition Award is bestowed to individuals whose careers include a long association with the midstream industry.