Well Pad Gathering Projects

Well Pad Gathering Projects

ZAP completed work on pipelines from nine well pad sites that each required the install of an oil gathering, produced water, and freshwater pipeline lateral. Pipeline sizes included 12, 8, and 6 inch lengths, ranged from 500 LF to 7,000 LF. Scope included laying out launchers, receivers, valve sites, and tie-ins to LACTS / existing pipelines.