Cryogenic Plant
ZAP was contracted by the cryogenic plant equipment packager to engineer and design the installation of a greenfield cryogenic gas plant in the Permian Basin. ZAP worked with the packager to design the balance of plant equipment including residue compression, amine plant, flare, thermal oxidizer, modular pipe rack design, and new power distribution center building. ZAP provided a completed construction package just five months after being awarded the project allowing for an expedited completion of the project. At the completion of the project, ZAP was contracted to engineer and design a second 200 MMSCFD train with a similar layout. This was accomplished at a fifty percent savings in engineering cost.