Engineering &
Construction Services, Inc.

Pipeline Pump Design

Pipeline Pump design

An NGL Pipeline increased operating pressure to 1,440 psig and a client contracted ZAP to install new boost pumps to boost both Cryo plant 1 and plant 2 into the existing pipeline. Two additional centrifugal, horizontal pipeline pumps were installed downstream of the amine treating train for plant 2 and downstream of the existing pipeline pumps for plant 1. The pumps were configured to have the ability to boost either the Plant #1 NGL product, the Plant #2 NGL product, or both streams combined as needed. Discharge pressure is based on 95% of the pipeline MAOP (1440 psig) and limited by existing piping design.

Pipeline Pump Design

Meet the Team. (877) 827-0814

Call or send us your scope and we’ll assemble the team of experts who will help you successfully execute your project.

Schedule a meeting

ZAP ECS Logo

Excellence in Execution

Latest news and updates from around the company.

See All News

Steve Tzap Awarded the GPA Midstream Recognition Award

The GPA Midstream has awarded Steve Tzap The Recognition Award for his service to the Gas Processors Association over the years. The Recognition Award is bestowed to individuals whose careers include a long association with the midstream industry.