Soda Ash Load-Out

Soda Ash Load-Out

ZAP completed the engineering and design to modify an existing truck loadout system fed from a storage dome and from the F&I silo to meet Food Safety Modernization Act (FSMA) regulations. This involved adding a common screen and magnet servicing both circuits. The existing chain conveyors were replaced with a bucket elevator and airslide to feed the new screen and magnet on the storage dome. The screw conveyors feeding the loading spout of the F&I silo feed were replaced with a belt conveyor. ZAP generated a 3D CAD model of the existing plant conditions at the F&I bin, truck loadout, and for the storage dome conveyors using existing drawings and the 3D point cloud. ZAP developed a conceptual model and a RISA model of the existing structures and analyzed added loads from new equipment.  

Soda Ash Loud Out

Meet the Team. (877) 827-0814

Call or send us your scope and we’ll assemble the team of experts who will help you successfully execute your project.

Schedule a meeting

ZAP ECS Logo

Excellence in Execution

Latest news and updates from around the company.

See All News

Steve Tzap Awarded the GPA Midstream Recognition Award

The GPA Midstream has awarded Steve Tzap The Recognition Award for his service to the Gas Processors Association over the years. The Recognition Award is bestowed to individuals whose careers include a long association with the midstream industry.